SOFA/BED/FUTON (1)
Town of HHISTR Permit #24867
HIGHLIGHTS
• Oceanfront Community
• Ocean/Pool View
• Free Wireless Internet
• 2 TVs
ONSITE AMENITIES
• 2 Outdoor Pools (Heated March 15th – April 30th, October 15th – November 30th) *Dates Subject to Change
• Kiddie Pool
• Community Grills
• Fitness Center
• Community elevators
• Free Dunes Buggy ride to Shelter Cove Marina (March-October)
PROPERTY CONFIGURATION
• 1 Bedroom
• 2 Baths (both with walk-in showers)
• Sleeps 4
• Washer/ Dryer
• Fully Equipped Kitchen
BEDDING BREAKDOWN
• Bedroom 1 - 1 King
• 1 Queen Sleeper Sofa
**Please Note: Beach renourishment projects are currently underway and will continue through late spring. While work is active at times, the beach remains open for guests to enjoy and access the shoreline daily. We appreciate your understanding as the community works to enhance and preserve our beautiful beaches!
PROPERTY REMINDERS
• Pets are not allowed.
• Parking passes should be displayed at all times.
• The Vacation Company's Guest Connect will contain all your check-in information (lock codes, Wi-Fi codes, and other information pertinent to your stay).
-
Fitness Room
-
Grill/BBQ - Community
-
Hot Tub/Spa - Community
-
Pool Access
-
Free Wifi
-
Satellite / Cable
-
Linens Provided
-
Towels Provided
-
Coffee Maker
-
Cookware
-
Dishes & Utensils
-
Dishwasher
-
Ice Maker
-
Microwave
-
Oven
-
Refrigerator
-
Stove
-
Toaster
-
Utensils
- bay/sound
-
Community Pool
-
Marina
-
Pickleball
-
playground
-
Restaurants
-
Balcony
- Heatable Pool
-
Hot Tub
-
Kiddie Pool
- Outdoor Spa
-
Patio
- Tennis
-
Air Conditioning
-
Clothes Dryer
-
Deck / Patio
-
Dining Area
-
Dining Table
-
Elevator - Community
-
Hair Dryer
-
Heated Pool
-
Iron & Board
-
Washing Machine
-
Contactless Check-In & Check Out
-
Deadbolt lock on entryway
-
Fire Extinguisher
- Keyless
- NO Animals Allowed
-
No-contact check-in and check-out
-
Nonsmoking only
-
Smoke detectors
-
Beach View
-
Beachfront
- Ocean View
- Oceanfront
- Water View
-
Waterfront
- Hampton Place
-
Communal Pool
Town of Hilton Head Island Beach
Renourishment Project
HILTON HEAD ISLAND, S.C.
This is a 24/7 project.
The beach renourishment project will occur in three phases, with an anticipated completion date of May 2026. The anticipated schedule is as follows:
- Phase 1 - Port Royal (the Heel), Fish Haul and Pine Island
- Complete - Contractor mobilizes in August 2025.
- Complete - Weeks of August 13, 2025 thru September 17, 2025 - Fish Haul area
- Complete - Weeks of September 18, 2025 thru October 10, 2025 - Pine Island
- Complete - Weeks of October 11, 2025 thru October 17, 2025 - Port Royal (The Heel)
- Phase 2 - Central Island, South Island and South Beach
- Weeks of December 11, 2025 thru March 28, 2026 - Central Island, including beach areas along Palmetto Dunes
- Weeks of March 28, 2026 thru May 31, 2026 - South Island and South Beach areas .
- Phase 3 - Pine Island Breakwater Structures
- Weeks of November 1, 2025 thru April 30, 2026
As there are many factors that can impact the project schedule, particularly weather and marine conditions, the public is encouraged to stay updated on the project’s progress—including location schedules, an interactive map, photos, FAQs, and more. More information can be found as follows:
-
Town website at hiltonheadislandsc.gov/
beachrenourish2025/ -
Town e-subscription: Sign up to get email and text notifications through the Town’s free e-subscription service at hiltonheadislandsc.gov. Click subscribe & select “Beach Renourishment Project Updates” under topic categories.
-
Town Facebook: www.facebook.com/townofhhi
For more information or answers to questions regarding beach renourishment, please reach out to communications@
“It’s a priority to preserve, protect and cherish our beaches – one of our greatest assets. Our Island depends on their ongoing vitality. The Town’s role is to carry out the community’s collective dedication to this environmental core value through our investment in restoration and maintenance,” said Mayor Alan Perry. “And fortunately, due to the foresight of Town leaders before us and thanks to our millions of visitors, this project is funded through our beach preservation fund and capital improvement program.”
Beach renourishment is a moving work zone that typically progresses at about 1,000 feet per section-just 2% of the Island’s total beach area. On average, only 300 feet of beach will be impacted per day. Temporary beach access ramps and clear signage will help direct beachgoers safely around active work areas to open areas of the beach. As soon as an active site is completed, the equipment will move down the beach and the newly renourished section will open.
Special protection has been made for wildlife that may be impacted because of the project. All work will be supervised by consultant teams under contract to monitor sea turtles and migratory shorebirds. Additionally, per a requirement of the beach renourishment permit from the U.S. Army Corps of Engineers and U.S. Fish and Wildlife Service (USFWS), the Town amended its municipal code to restrict animal/dog activity in an area adjacent to Fish Haul Creek beach park. This requirement protects endangered shorebird species that migrate and nest there. Signage is posted and no other beach areas will be affected. Dogs are still allowed per the Town’s seasonal rules – only a small section of the creek area adjacent to the beach park is restricted.
Marinex Construction, Inc., the contractor for the project, began mobilizing equipment this month in preparation for the work. This includes positioning their offshore barges and staging miles of steel pipes to pump sand from ocean shoals back to beaches. Crews will be working around the clock daily.
The beach renourishment process helps to:
- Preserve a healthy shoreline ecosystem for wildlife such as sea turtles and shorebirds.
- Protect beachfront properties and infrastructure from storms.
- Provide wider, more enjoyable beaches for residents and visitors alike.
The public is encouraged to stay updated on the project’s progress—including location schedules, an interactive map, photos, FAQs, and more. Please:
- Visit the website at https://hiltonheadislandsc.
gov/beachrenourish2025/ - Sign Up: Get email and text notifications through the Town’s free e-subscription service at https://hiltonheadislandsc.gov
. Click subscribe & select “Beach Renourishment Project Updates” under topic categories. - Follow on Facebook: https://www.facebook.com/
townofhhi